'What-If' rack layouts
For planning purposes, it would be handy to be able to create layouts for rack deployments that would not effect the current layout. So, i should be able to create a rack-1:whatif, place existing and devices in it, plan out the connectivity, etc. without that effecting the existing documentation of the present state.
5
-
Following and calling out that from an enterprise client perspective this is a major challenge and forcibly requires tracking planned changes outside of device42's dcim.
I had hoped to move aware from spreadsheets - but this continues to be a problem1
Please sign in to leave a comment.
Comments
1 comment